Click To View Big Photo

1200mm 18W Integrated T5 LED Tube Light

Inquiry Us

Product Feature

1、Up to 80% Energy-saving, mercury-free and 100% recyclable, energy saving and environmental protection
2、Constant current Isolated internal driver, safety guaranteed
3、High PF value over 0.9 for decrease of electricity loss
4、High quality PCB for good heat dissipation
5、Above 110LM/W high light efficacy, cost effective
6、No flicker,no delay, Instant on/off
7、Direct replacement for T5 fluorescent tubes is used to quick and easy installation to minimize retrofit and maintenance costs
8、 Widely used in factories, car parks, supermarkets, offices and other public places is best retrofit for Philips, Osram, Panasonic T5 fluorescent lamp



Product Specification


 

Model KJ-T5-120CM-18W              LED SMD2835
Watt(w) 18 Luminous Efficiency(lm/w) 110
Size(mm) 1178*35*22  Luminous Flux (lm) 1980
Input Voltage(V) AC 100~265 50/60Hz      Max Connect T5(PCS) 10
PF >0.94 Beam Angle 140°
CRI(RA) >80 Color Temp(K) 2700~6500,optional
Warranty(Year) 2 Replacement 46W
Certification CE ROHS SAA
Material Lamp Shell:Aluminum
Cover:Flame retardant PC
Pin :Copper
Series 300mm 5w, 600mm 10W, 900mm 13W, 1200mm 18W 20W, 1500mm 23W 25W
 


Product Photo








Application:



Packing
Under condition of comply with relevant regulations and rules, we can pack goods more
perfect as per your request,We can provide you with relevant packing solution according
to your order quantity,shipping method,and selling ways,
such as, color box/white box/cartonboard tube box+outer carton,the below is our regluar packing






 Installation Steps


一、Installation Step For One LED T5


1、Switch off power supply, wire the three-pin plug. (Note: L:live line ; N: null line ; yellow line: ground line)
2、Put two metal buckles into the place where need to install led tube
3、Put led tube into metal buckles, insert the three-pin plug into led tube, 
       then put the cover into the another end


二、Installation Step For More joint LED T5



1、Switch off power supply, wire the three-pin plug. (Note: L:live line ; N: null line ; yellow line: ground line)
2、Put two metal buckles into the place where need to install led tube
3、Put led tube into metal buckles, put the plug into led tube, 
      then put the cover into the other end,Insert connector into led tube,
 
      put led tube into metal buckle,
     
     then connect two led tubes with connectors and put the cover into the 
    last led tube’s end,the plug of first led tube connect the socket. 

Pay Attention:the total power less than 200w.(60cm led tube t5 connect <20pcs ,120cm<10pcs)
4、Switch on power
 
Contact Us

Add: Paotai road,Haojing building 6,Bao'an district,Shenzhen,China

TEL: +86-755-29728073

FAX: +86-755-27095496

E-mail: lighting@kingjie-led.com

Copyright © 2016 Shenzhen Kingjie Lighting Co., LtdSupported by:buy-hk.com